Operator & Service

VISION

The importance of operator training in production works.Important work skills in operation of PM Hoist, Suspended Rope Platform,Tower Hoist etc.

Syllabus:(Theory and practical)(22 days)

The operator learns the following equipments operations.

1) Pm Hoist, 2) Suspended Rope Platform, 3) Tower Hoist, 4) Mini Cranes

1. Passenger & Material Hoist (PM Hoist) (8 days)

• Introduction of all parts in PM hoist.

• Technical Performance.

• Assembling of all parts.

• Details of motors, switches and power supply.

• Checking of oil, grease and lubricating to all parts.

• Use and work ranges.

• Operation procedure.

 

2. Suspended Rope Platform (6 Days)

• Introduction of all parts in Suspended Rope Platform.

• Assembling of all parts.

• Details of main switches and power supply.

• Use work ranges and maintenance.

• Electrical charts inb detail.

 

3. Tower Hoist (5 Days)

• Introduction of Tower Hoist.

• Details of Wire Rope.

• Trolley speed.

• Inspection and Operation procedures.

• Technical Performance.

 

4. Revision (3 Days) :

1. PM Hoist, 2.Suspended Rope Platform, 3.Tower Hoist

 

5. Test-1 Hour.

 

SERVICE TRAINING

Pre-Requisite:-

ITI Passed, SSC passed and appeared candidates for Service Trainee.

Syllabus ( 1 ½ Month)

As per our manual trainee should learn the following operations must learn and operate the Tower Cranes, PM Hoist, Suspended Rope Platform, Tower Hoist and Mini Cranes etc.

1. Tower Crane (12 Days)

• Introduction of Tower crane.(Sub assembly description)

• Technical performance parameters

• Dimension and weight of equipment. (1.Fixed Foundation, 2.Main Parts of dimension and weight).

• Requirement of erection (Earthing, Power supply etc).

• Erection of Equipment. (Installation and Assembling of all parts).

• Inspection, Debugging and Operation of equipment.

• Top climbing and descending of equipments.

• Dismantling of each equipment.

• Maintenance. (1.Composing (Drawing), 2.notice before use).

• Electrical charts in detail analysis.

• Free fittings.

2. PM Hoist (8 ays)

• Introduction of PM Hoist.(Sub assembly description)

• Technical performance

• Requirement erection (Installation and Assembling of all parts).

• Inspection and Operation of equipment.

• Installation of anchoring device.

• Dismantling of equipment. (1.Grease, Lubricating, 2.Repair and Maintenance, 3.Use and work ranges, 4.Working condition).

• Electrical charts in detail analysis.

• Free fittings.

3. Suspended Rope Platform (8 Days)

• Introduction of Suspended Rope Platform (Sub assembly description).

• Technical performance parameters.

• Assembling and dissembling descriptions.

• Requirement of power supply.

• Inspection and operation of equipment.

• Movement of Up and Down as per convenient.

• Maintenance. (1.General function, 2.Repair and maintenance, 3.use and work ranges, 4.Working condition, 5.Use and work ranges,

6.Electrical charts in detail switches and main box.)
• Free fittings.

4. Tower Hoist (7 Days)

• Introduction of Tower Hoist. (Sub assembly description)

• Height of masts minimum 10 meters to max 100 meters.

• Details of work rope.

• Trolley speed.

• Details of power supply.

• Inspection and operation of equipment.

• Details of Tower angle.

5. Revision (3 days):

1. Tower Crane, 2.PM Hoist, 3.Suspended Rope Platform, 4.Tower Hoist.

6.Test – 1Hour